Work Smarter not Harder
with Smartraft®
Leading innovation in civil engineering
Fast, efficient, and safe VRS barrier installation
Become a Smartraft®
Approved Installer!
About Smartraft® Modular Solutions
Smartraft® is an off-site prefabricated, modular concrete foundation to allow for a safe, quick, efficient VRS barrier installation.
It can be safely installed over and in close proximity to underground services and drainage systems whilst still maintaining access. Smartraft® is faster, more efficient and a safer installation compared to conventional methods.
Smartraft® can be used for permanent or temporary solutions and is compatible with many proprietary VRS systems, including Hill & Smith single sided and double-sided systems and terminals and Saferoad VRS Systems. It can also be compatible with non-proprietary systems (TCB & OBB) and terminals.
Media error: Format(s) not supported or source(s) not found
Download File: https://smartraft.co.uk/wp-content/uploads/2024/08/Environmental-Render.mp4?_=2About Hydroraft®
Hydroraft® is a combination of the proven modular highways foundation- Smartraft® integrating a product called “Hydrorock” to provide improved drainage systems on our highways.
Hydroraft can be supplied with the ability to incorporate VRS systems & as a load bearing drainage system installed without VRS.
Media error: Format(s) not supported or source(s) not found
Download File: https://smartraft.co.uk/wp-content/uploads/2024/09/Hydroraft-Video-V8_LR.mp4?_=4Latest News
Latest News
Smartraft® Launches New Website
Smartraft® are excited to announce that we have launched our website www.smartraft.co.uk
Proudly Working With























CONTACT
CONTACT
Case Study
Case Study
A14 Junction 36 Entry Slip Road Smartraft® Repair
This project was to repair a Vehicle Restraint System, on the near-side verge, at the top of the A1303 slip road to the A14…
TESTIMONIALS
Congratulations to everybody for the great achievement in opening the Swavesey westbound to traffic. This is even more special because we’ve done it on time hitting another one of our critical milestones. Thank you all.
Roadworks Manager (S4) - A14 Integrated Delivery Team
Everything was great as always. A big thanks for all your help and efforts to get this project completed.
Kemal Bakici - Balfour Beatty
Well done it looks a very good job, done in quick time and as promised. The TM was spot on.
Contracts Manager, Ringway.
Congratulations to everybody for the great achievement in opening the Swavesey westbound to traffic. This is even more special because we’ve done it on time hitting another one of our critical milestones. Thank you all.
Roadworks Manager (S4) - A14 Integrated Delivery Team
Everything was great as always. A big thanks for all your help and efforts to get this project completed.
Kemal Bakici - Balfour Beatty
Well done it looks a very good job, done in quick time and as promised. The TM was spot on.
Contracts Manager, Ringway.
Congratulations to everybody for the great achievement in opening the Swavesey westbound to traffic. This is even more special because we’ve done it on time hitting another one of our critical milestones. Thank you all.
Roadworks Manager (S4) - A14 Integrated Delivery Team